EAST LINK RECREATION CENTRE – GRANDE PRAIRIE, AB – AQUATIC VIDEO DISPLAY DESIGN AND TENDER CONSULTING – CURRENT – AUG 2024
RecTec has been retained by the City of Grande Prairie to provide video display consulting services in the design, tendering and installation of a new Video Display to be installed into the Natatorium of the EastLink Recreation Centre.
CANADA GAMES AQUATIC CENTRE - THUNDER BAY, ON – AQUATIC VIDEO DISPLAY AND TIMING SYSTEM UPGRADES – CURRENT – JAN 2024
RecTec has been awarded the contract from the City of Thunder Bay to Supply and Install a full aquatic Video Display Board and Timing System into the Canada Games Aquatic Centre for the upcoming Ontario Winter Games and Legacy events for years to come. The system includes a MRI V
OLYMPIC PARC POOL – MONTREAL, QUE – AQUATIC VIDEO BACK UP SYSTEM – CURRENT – FEB 2024
RecTec has been awarded the contract from the Federation du Natation du Quebec to Supply and Install a full aquatic Video Back Up System into the Olympic Parc Pool for the upcoming Canadian Olympic Trials 2024 and Legacy events for years to come. The system includes an ICC Video Back Up System.
WINDSOR INTERNATIONAL AQUATIC AND TRAINING CENTRE – WINDSOR, ON – AQUATIC VIDEO BACK UP SYSTEM – CURRENT – FEB 2024
RecTec has been awarded the contract from the Essex Aquatic Group to Supply and Install a full aquatic Video Back Up System into the Olympic Parc Pool for the upcoming Speedo Canadian Masters Championships and Legacy events for years to come. The system includes an ICC Video Back
ALDER RECREATION CENTRE – ORANGEVILLE, ON – SCOREBOARD AND TIMING SYSTEM INSTALLATION – CURRENT – FEB 2024
RecTec has been awarded the contract from the Town of Orangeville to Supply and Install a full aquatic LED Scoreboard and Timing System into the Alder Recreation Centre for use by the local swim club and organizations to automate their swim meets. The system includes a full Swiss Timing Scor
ST. ANDREWS COLLEGE – AURORA, ON – STARTING BLOCKS AND TIMING SYSTEM UPGRADES – NOV 2023
RecTec was awarded the contract from St. Andrews College to install new Starting Blocks, Step Ups and timing system into the Aquatic Centre at the College. This system will be used for internal training along with hosted swim meets to automate their system.
Copyright © 2023 RecTec - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.